Electric tricycle citycoco scooters CKD scooter moped with two wheels electric motorcycles price list from China manufacture
- Use For:
-
Passenger
- Driving Type:
-
Electric power
- Certification:
-
CCC
- Power:
-
> 800W
- Voltage:
-
48V
- Brand Name:
-
qiangsheng
- Place of Origin:
-
Hebei, China
- Size:
-
1980*700*1100mm
- Name:
-
scooter electric adult
- Keywords:
-
electric tricycle scooter
- Use:
-
Passenger or school use
- Driving Type::
-
electric
- Battery type:
-
water acid battery
- brake:
-
Drum Brake
- motor:
-
800W brushless hub motor
- color:
-
optional
- Brake System:
-
F&R Disc Brake
- Battery:
-
48V/60V 20AH
Main components
|
||
Motors available:
|
800W brushless hub motor
|
|
Battery:
|
48V/60V/72V 20Ah battery
|
|
Controller:
|
intelligent 12 tube controller
|
|
Charger:
|
5A Smart Charger, 110V/220V
|
|
Brakes:
|
Front and rear disc brake
|
|
Suspension:
|
Front hydraulic /rear spring
|
|
Tires:
|
3.00-10 vacuum tire
|
Performance foradult electric scooter
|
||
Charging time:
|
5-6 hours
|
|
Recharging cycles:
|
1000 times
|
|
Max speed:
|
45km/h
|
|
Driving distance per charge:
|
50-60km
|
|
Loading capacity:
|
150kg
|
|
Climbing capacity:
|
15%
|
|
Dimension:
|
1980*700*1100mm
|
|
Wheelbase:
|
1390mm
|
|
Grand clearance:
|
140mm
|
Packing formotorcycle two wheeler adult
|
||
G.W.:
|
105kg
|
|
N.W.:
|
95kg
|
|
Packing:
|
Iron packing frame & Carton
|
|
Carton size:
|
1900*580*860MM
|
|
Container loading QTY:
|
90units/40′HQ
|
Controller :36tubes .24tubes .18tubes.12tubes.3000w and 5000w
Brake :Oil drum brake and rear drum brake /double rear drum brake
We can do customized for mechanical parts
Ø For each container products, we will 100% check the quality and quantity from preparing to loading.
Quanlity guarantee period ( driving under normal conditions)
Factory + trade (mainly factories, so the quality can be ensured and price competitive)
2.How long have your company run on tricycle?
10 years focusing on tricycle,6 years exporting experience.
3,Which payment terms are you accept?
Payment Terms: T/T, or LC
4.After an order is placed, when to deliver?
it will be decided by the time of the factory production and your quantity.Normally around 15 days.
5.If the products are not conformity with requirements, how to solve?
If the products are not conform to customer samples or have quality problems, our company will be responsible for it.
6.What about the cooperation process?
Confirm details of order, 30% deposit, Arrange production, pay the balance, shipmen
Our factory covers an area of 80,000 square meters. owns the most advanced production line and detection equipment, professional welding workshops, machining workshops, electrophoresis painting workshops and assembly workshops.
Our electric motorcycle have been awarded numbers of patents about: Double rear axle, Multifunctional shed, Gearbox, Electric insulation box, Movable seat, Folding seat, etc. We are awarded Chinese famous brand, consumers trust products, CCTV Brand as well. We have built stable supplying relationship in South Asia, Southeast Asia, Middle East Asia, Africa, South America, etc.
For our products Production, we keep high standard from beginning.
Raw Material Choosing
We choose reliable raw material brands as our long term cooperation partner. Every batch of raw material will be inspected randomly before delivered into our warehouse. Once the off-test material been tested, the whole batch will be returned back to supplier. The steel grade we use for our electric is Q195 and SPCCH. Thickness of the electric motorcycle body steel is 1.8mm–2.0mm.
Cutting and Punching
A high uniform performance can be assured by our laser cutting, hydraulic punching&CNC tube
cutting machines
Every cutting is controlled by computer and carried out by our laser cutting machine and CNC tube cutting with a strict cutting tolerance. Hydraulic punching machine gives a long time forming tolerance of parts.
Robot Welding
Robot welding is used for the main body of our electric motorcycle, which assures a long life span of the steel body and enlarge the safety of the users.
Electroplating and Painting
In 2011, Qiangsheng invested over RMB2,000,000 on cathode electrophoresis paint assembly line, which is widely used in automobile industry. All the paint used for the manufacturing are all top-classed paint without pollution, no smell, and no peeling. It helps a lot on Reducing the corrosion-specific repair and maintenance cost & reducing the wear and tear.
Innovation & Professional R&D department
New models e rickshaw give customers new choices and inject vigor for the market. We have 20 R&D staffs for domestic and abroad market. Each month we develop around 2 new models for customers.
Company informatio
Qiangsheng Group is founded in 2005,Located in Xianghe county(Beijing-Tianjing corridor).
It is a professionl enterprise that specializing in electric tricycle R&D,production,sales,trading and spare parts service.
Our factory covers an area of 50,000 square meters,owns the most advanced production line and detection equipment,professional welding workshops,machining workshops,electrophoresis painting workshops and assembly workshops.
Our electric tricycle have awarded numbers of patents:Double rear axle,Multifunctional shed,Gearbox,Electic insulation box,Movable seat,Folding seat,Etc.We are awarded Chinese
famous brand,Consumers Trust products,CCTV Brand as well.We have built stable supplying
relationship inSouth Asia,Southeast Asia,Middle East Asia,Africa,South America.
Company Name:Xianghe Qiangsheng Electric Tricycle Factory
Operational Address:Qianwang Industry Park, Xianghe County, Langfang, Hebei, China
PACKING
CKD reduce the sea freight of a single vehicle , save the transportation cost
SERVICE
24-hour online servic
We will send customers a video to show them how to assemble an electric tricycle for cargo or passenger.
Any questions are welcome
FAQ
1.Q: Where is your company located? How can I visit there?
A: Our factory is located in Xianghe county (Beijing- Tianjin corridor), Hebei province, China. Welcome to visit us, the nearest
airport is Beijing capital international airport, and we will arrange customer pickup.
2.Q: What’s the MOQ?
A: Our economic order quantity is a 20′ GP amount. Sample and LCL shipment accepted, but cost much higher.
3.Q: What is the payment terms?
A: T/T is our preference. 30% as deposit, and 70% before delivery. Photos of the products and packages will be sent to you before
you pay the balance.
4.Q: What’s the delivery time?
A: Mostly we don’t have products in stock, it will take about 15-20 days to finish an order generally speaking.
5.Q:What is your shipping terms?
A: EXW, FOB, CIF.
6.Q: What certificate do you have?
A: We can apply any certificate under your require if the order QTY is OK.
7.Q: Do you test all your goods before delivery?
A: Definitely! 100% test before delivery by professional test line is necessary to us.
8.Q: How do you make our business long-term and good relationship?
A: We keep good quality and competitive price to ensure our customers benefit, and we respect every customer as friend doing business with them sincerely, no matter where they come from.